Industries · Agriculture

Battery storage for agriculture.

Farms sit at the end of long rural lines, with seasonal loads and a generator for when the feeder trips. Storage paired with solar carries the packhouse through the peaks, rides through outages and puts the genset back in reserve.

01 · The problem

What the site
is up against.

Network

Long, weak rural feeders

Ruraflex and Landrate sites are often at the end of long lines, with trips from storms, veld fires and faults.

Season

Load that follows the harvest

Packing, pre-cooling and irrigation crowd into a few months, so the busiest weeks set the demand the farm pays for all year.

Tariff

A thin off-season price gap

Outside June to August the gap between peak and off-peak prices on Ruraflex is small, so storage alone does not always pay.

02 · What storage does

What the battery
does about it.

  1. 01
    Solar into the eveningStores midday solar and releases it in the evening peak; through HELIOS the array charges the battery directly on the DC side.
  2. 02
    Peak shiftingMoves packhouse and pre-cooling load out of the high-season peaks, when the price gap is widest.
  3. 03
    Ride-throughCarries the cold rooms, pumps and controls through a feeder trip, with transfer to island in under 10 ms through a PULSE switching cabinet.
  4. 04
    Diesel displacementThe genset becomes the last line of backup rather than a daily resource.
  5. 05
    Demand ceilingHolds the harvest-season half-hour peak so the notified demand can come down.
03 · Typical configuration

Indicative,
before the load study.

SystemsA2000, or A1000 blocks in 1 MWh steps
Connection400 V on the farm or packhouse board
Duration2 hours, with a reserve held back for the cold rooms
Pairs withHELIOS DC-coupled solar, existing roof PV and gensets
Commercial modelPurchase, with a 15-year O&M agreement; a service agreement as the alternative

Every configuration is sized from the site's own interval data and tariff; this is a starting point, not a quote.

Part one

Where a farm’s power money goes, and how storage and sun bring it back.

The four-page sector brief, on the page: what Ruraflex charges in its peak windows and how thin the gap is the rest of the year, the system we put on the farm’s own board, what it does when the feeder trips, and what it returns.

Download the flyer
04 · Where the money is

Winter pays the peak.
The sun pays the rest.

On Ruraflex a June-to-August peak kilowatt-hour costs six times an off-peak one. From September to May the gap is 2.5 times, thin for storage on its own. Midday sun, stored for the evening, closes it.

Fig 04-1 · Average high-season weekday, citrus pack-houseModelled · kW
PEAKPEAK04008001 2001 600kWCold roomsPre-coolingPacking linesDegreeningIrrigationWorkshop & servicesGrid draw, with plantSolar outputCEILING 1 150 kW00:0003:0006:0009:0012:0015:0018:0021:0024:00

The case-study pack-house. The white line is grid draw with one APEX A2000 and a 600 kWp HELIOS array: near zero through both peak windows, under the 1 150 kW ceiling all day and refilled off-peak. The dashed gold line is all the solar on site, roof and ground.

Ruraflex 2026/27 · ≤ 22 kVc/kWh ex VAT
High-season peak740 cHigh-season standard185 cOff-peak, all year123 cLow-season peak307 cLow-season standard173 c

Active energy, transmission zone 1. Landrate, the flat rural tariff for smaller supplies, has no peak at all: there the battery earns on outages and on stored sun.

Who it is forRuraflex and Landrate
OperationWhat drives the billBattery role
Pack-housesCold rooms in the winter peakPeak shifting
DairiesMilk cooling in both peaksPeak shifting
Poultry housesFans that cannot stopRide-through
Grain dryingWeeks of heavy fan loadDemand ceiling
IrrigationLong runs, mostly off-peakSun by day
Landrate suppliesFlat rate, no peakSun and outages
3.5R mGross saving, year oneAt FY2027/28 prices
53%Energy saving from sun902 MWh a year through HELIOS
75%Less energy bought in peak514 MWh a year moved out
<5yearsSimple paybackOn an indicative turnkey cost
05 · The system

Low voltage,
on your own board.

One container on the farm’s critical board, a solar converter beside it and a transfer cabinet in front of it. Solaris™ EMS runs all three, under one point of responsibility.

Fig 05-1 · Capacity retention, measured% of day one
60 %70 %80 %90 %100 %15-YEAR TERMY0Y5Y10Y15Y201.0 cycle / day1.52.0Case pack-house, 1.02 / day80 % in year 1276 % at year 15

The cell maker's tabulated 20-year test set at 90 % depth, by cycles a day. The cyan line is the case pack-house’s duty.

Ageing you can bank onAPEX datasheet
≈ 7 000full cycles

To 70 % state of health at one cycle a day and 98 % depth. Measured on the cell, not assumed.

76 %health at year 15

At the case pack-house’s duty of 1.02 cycles a day and 90 % depth. No augmentation in the term.

≥ 88 %round trip

AC to AC, through the PCS. 94 % DC at the battery, beginning of life.

Solaris keeps 400 kWh in the battery at all times for the critical loads. It is never spent on the tariff.

06 · Feeder down?

The farm runs
as its own island.

Rural lines trip: storms, veld fires, theft. PULSE, the A2000 and HELIOS sit on the farm’s critical bus, so the loads that cannot stop do not, and the genset waits its turn.

Fig 06-1 · Single-line, critical bus behind PULSESimplified
ESKOM 22 kVkWhRevenue meterT1 · 22 / 0.4 kVPULSEP1000≤ 10 msGGensetlast resortCRITICAL BUS · 400 VMCold roomsMFansMMilk coolingCRITICAL LOADScarried through an outageNEWPCSinsideAPEX A2000HELIOS H500DC / DC600 kWpnew arraySOLARIS™ EMStariff · ceiling · island · reserveACDC, solar to batterySolaris control
01The critical loads never see the trip

PULSE opens in half a cycle and the A2000 takes the voltage. Cold rooms, poultry fans and milk cooling run on.

02Sun keeps charging off-grid

HELIOS sits on the battery’s DC bus, so the array keeps charging while the farm runs on its own.

03Genset last, at a good load

Solaris starts it only when the battery runs low. In the case study its hours fall from 64 to 14 a year.

04Back in phase

When Eskom returns, the PCS steers the island onto the grid; PULSE closes when both sides match.

07 · The return

An asset that pays for itself
in less than five years.

Figures from the modelled pack-house on this page, at an indicative turnkey cost. A site proposal replaces them with your own.

<5yearsSimple paybackOn an indicative turnkey cost
30%Project IRR, 15 yearsAfter O&M, no augmentation
5.9×The investment, returnedNet cash over the term
Three ways to buy
Purchase Most farms

Turnkey supply, install and commissioning. You own the plant; we run it under a 15-year O&M and availability agreement.

Service agreement

We own and run the plant for a fixed monthly fee, for operations that keep storage off the balance sheet.

Phased

Start with the critical board and the array; add a second A2000 when the next season’s plan allows.

Load study to power in 26 weeksOrder in the summer, live for the harvest
WEEK 1Load studyyour data, our modelWEEK 5Proposalsizing, price, termsWEEK 10Studies and orderEskom application, protectionWEEK 20On siteslab, array, cableWEEK 26Powerlive for the harvest
Part two

Taking a citrus pack-house out of the peak.

Illustrative case · composite site · not a client project

The eight-page business case, on the page: a composite citrus pack-house and cold store in the Letsitele valley, Limpopo, on a 22 kV rural line, modelled half-hour by half-hour for a year on Eskom’s 2026/27 Ruraflex tariff, then carried over fifteen years.

Download the business case
08 · The site

A pack-house at the
end of a rural line.

The packing lines run April to September; the cold rooms run every hour of the year. The bill is R12.5 m, and 36 % of the energy cost is bought in 14 % of the hours.

Illustrative case · composite site · not a client project

Site profileComposite
OperationCitrus pack-house + cold store
RegionLetsitele valley, Limpopo
Supply22 kV rural overhead line
TariffRuraflex Ru12N, zone 1
Transformers2 × 1 250 kVA, 22/0.4 kV
Notified demand1 700 kVA
Recorded peak1 584 kVA, June
Power factor0.90 lagging
Roof solar600 kWp, zero export
Standby500 kVA genset, cold store
Grid energy5.0 GWh a year
Annual billR12.5 m ex VAT
Annual bill, beforeR m ex VAT
Energy, peakR3.52 mEnergy, standardR3.24 mEnergy, off-peakR3.11 mLegacy & ancillaryR1.26 mCapacity chargesR1.23 mService & adminR0.09 mReactive energyR0.07 m

Peak energy costs more than all off-peak energy, in a seventh of the hours. It is the line the battery attacks first.

Energy by end useMWh a year
Cold rooms2 723 MWhIrrigation1 098 MWhPacking lines665 MWhWorkshop & services661 MWhPre-cooling526 MWhDegreening205 MWh

The cold rooms set a floor that never moves. Irrigation is already pumped off-peak, so it stays on the grid.

Fig 08-1 · Every half-hour of the yearGrid draw without storage · MW
00:0006:0012:0018:0024:00APRMAYJUNJULAUGSEPOCTNOVDECJANFEBMAR1.60MW

Each column is a day from April 2026 to March 2027, each row a half-hour. The bright block is the packing season, densest from June to August when the lines run a second shift. The dark midday band is the roof array at work; the night band is the irrigation pumps.

01The brief

Cut the cost of the peak windows and hold the cold rooms through feeder trips, without touching packing throughput.

02The constraint

Capital is approved on payback: the board’s hurdle is five years. One spare way on the cold-store board and fallow land beside it.

03The risk

The feeder trips about 26 times a year. Each trip stops every compressor, and a cold-treatment run depends on holding fruit temperature.

09 · The load

The harvest lands
in the dearest months.

Valencias and navels are packed from April to September. The heart of it, June to August, is Eskom’s high season, when a peak kilowatt-hour costs six times an off-peak one.

Illustrative case · composite site · not a client project

Fig 09-1 · Average high-season weekdayJune to August · kW
PEAKPEAK04008001 2001 600kWCold roomsPre-coolingPacking linesDegreeningIrrigationWorkshop & services00:0003:0006:0009:0012:0015:0018:0021:0024:00
Fig 09-2 · Off-season weekdayNov – Feb · kW
PEAKPEAK04008001 2001 600kW00:0006:0012:0018:0024:00
Fig 09-3 · In-season SaturdayNo peak · kW
04008001 2001 600kW00:0006:0012:0018:0024:00
Fig 09-4 · What the peak periods cost, against the packing seasonR k, without storage
0200400600800R kAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarPACKINGESKOM HIGH SEASON
01The cold rooms never stop

Cold rooms and pre-cooling are over half the peak-window load. They cannot be switched off, only supplied differently.

02Winter costs 2.4 times more

The same kilowatt-hour costs R7.40 in a July peak and R3.07 in a November one, so three months carry most of the value.

03The sun is strongest in winter

The valley’s dry winter gives the array its best months exactly when the packing lines and the tariff peak together.

10 · The plant

One container,
one island.

The A2000 lands on the cold-store board behind a PULSE cabinet. A new array feeds its DC bus through HELIOS. The roof array and the packing lines on T2 stay as they are.

Illustrative case · composite site · not a client project

Fig 10-1 · Single-line, as connectedSimplified
Eskom 22 kVRuraflex · zone 1rural overhead lineMETER22 kV RING · CUSTOMER-OWNEDT1 · 1 250 kVA22 / 0.4 kVT2 · 1 250 kVA22 / 0.4 kVPULSE P1000static switch · ≤ 10 msGGenset 500 kVAexisting · last resort400 V COLD-STORE BUS400 V PACK-HOUSE BUSCold rooms160–520 kWPre-cooling0–240 kWDegreeningApr–SepPacking lines0–380 kWIrrigation240 kWWorkshop40–120 kWRoof PV600 kWp · existingNEWAPEX A20001 MW · 2 088 kWhPCS inside · 400 VHELIOS H500DC/DC · 10 MPPTNEW 600 kWp GROUND ARRAYSolaris™ EMStariff · ceiling · islandreads roof PV and gensetMETER DATA → SOLARISSimplified single-line. Protection, earthing, metering CTs and auxiliary supplies omitted.
Plant at a glancePer the range datasheets
Battery1 × APEX A2000, 2 088 kWh LFP
Usable1 879 kWh at 90 % depth
Power1 000 kW, PCS inside, 400 V
SolarHELIOS H500, 600 kWp ground array
TransferPULSE P1000, ≤ 10 ms
Reserve400 kWh held for the cold store
ControlSolaris™ EMS, reads roof PV and genset
Footprint≈ 150 m² yard + ≈ 0.9 ha array
Fig 10-2 · The yardIndicative
EXISTINGCOLD STORET1PLANT YARD · ≈ 16 × 9 mA2000PULSEHELIOS600 kWp GROUND ARRAY · ≈ 0.9 haIndicative plan, not to scale. 3 m clearance around the A2000.LV cable to the T1 board ≈ 60 m.
Why one A2000 and an arrayFull year at FY2027/28 prices · indicative turnkey cost · NPV at 12 %
OptionRatingNMD afterCycles / yrGross savingPaybackNPV
1 × A2000, no solar1 MW / 2.1 MWh1 250 kVA366R2.1 m4.5 yrsR8 m
1 × A2000 + HELIOS ◆1 MW / 2.1 MWh1 250 kVA372R3.9 m3.7 yrsR19 m
2 × A2000 + HELIOS2 MW / 4.2 MWh1 250 kVA261R4.9 m4.2 yrsR22 m
3 × A2000 + HELIOS3 MW / 6.3 MWh1 250 kVA185R5.0 m5.3 yrsR15 m

Without solar the battery pays slowly: Ruraflex’s off-season spread is thin. The array nearly doubles the saving. A second A2000 adds R1.0 m a year but cycles less, since one already covers both peaks; it is the phase-two step. ◆ Selected.

11 · How it runs

Sun by day,
stored for the peaks.

Solaris empties the battery through both peak windows, refills it at midday from the array and tops it up off-peak, never above a 1 150 kW ceiling and never below the cold store’s reserve.

Illustrative case · composite site · not a client project

Fig 11-1 · Wednesday 15 July 2026 · high season, packingModelled · kW
PEAKPEAK04008001 2001 600kWCEILING1 150 kWSOC100 %0 %+1 MW0−1 MW00:0003:0006:0009:0012:0015:0018:0021:0024:00Load before the plantGrid draw with itBatteryHELIOS solarCharging from the gridState of charge
Fig 11-2 · Wednesday 18 November 2026 · off-seasonModelled · kW
PEAKPEAK04008001 2001 600kWCEILING1 150 kWSOC100 %0 %+1 MW0−1 MW00:0003:0006:0009:0012:0015:0018:0021:0024:00Load before the plantGrid draw with itBatteryHELIOS solarCharging from the gridState of charge

Gold: solar from the new array, delivered to site or stored. Cyan: energy the battery supplies, so the pack-house does not buy it. Grey: energy bought above the old draw to recharge, at off-peak or standard prices. The lower strip is battery power (±1 MW) and the state of charge; gold below the line is the sun charging it.

372Equivalent full cycles a year
699MWhDelivered from the battery
902MWhNew solar, through HELIOS
99.9%Of all solar used on site
12 · The bill

R3.9 m a year,
from four lines.

The array and the battery earn about the same share: solar replaces energy outright, storage moves the rest out of the peak. A lower notified demand and a better power factor add the remainder.

Illustrative case · composite site · not a client project

Fig 12-1 · Where the saving comes fromR k · FY2027/28
01 2502 5003 7505 000R k1 648Peak energyshifted1 826Solar viaHELIOS354Notifieddemand81Powerfactor3 910Gross savingper year
Fig 12-2 · Monthly peak demandkVA
03006009001 2001 5001 800kVAAprMayJunJulAugSepOctNovDecJanFebMarBeforeAfterNMD beforeNMD after
Value streamHow it is earnedPer year
Peak energy shiftedPeak kWh bought at off-peak and standard prices instead, net of 12 % lossesR1.65 m
Solar through HELIOS902 MWh a year from the new array, used on site or stored for the peaksR1.83 m
Notified demandNMD renewed at 1 250 kVA: generation and network capacity chargesR0.35 m
Power factorPCS holds 0.97 at the meter; the high-season reactive charge falls awayR0.08 m
TotalR3.91 m
Fig 12-3 · Monthly bill, before and afterR m ex VAT, FY2026/27 rates
0.00.51.01.52.0R mAprMayJunJulAugSepOctNovDecJanFebMarWithout storageWith the plant

Bills are rebuilt line by line from the Ruraflex schedule (Ru12N, ≥ 500 V and ≤ 22 kV, transmission zone 1). The notified-demand saving starts in year two, once the reduction is accepted at renewal. Avoided diesel and protected fruit are not counted.

13 · Fifteen years

Less than five years
to pay back. Then it saves.

The grower buys the plant turnkey and we run it. The saving rises with the tariff and eases as the cells and modules age; O&M is the only cost after day one.

Illustrative case · composite site · not a client project

<5yrsSimple payback
30%Project IRR
19R mNPV at 12 %
5.9×The investment, returned
Fig 13-1 · Saving, running costs and cash returnedNominal R m · tariff +8.83 % in year one, then 7 % a year
02.557.510R m / yrY1Y2Y3Y4Y5Y6Y7Y8Y9Y10Y11Y12Y13Y14Y15Investment repaid5.9× the investment0×2×4×6×8×returnedSaving on the billO&MCumulative cash returned, multiple of the investment
Fig 13-2 · What moves the NPVR m at 12 %
Discount rate14 %10 %Tariff escalation5 %9 %Peak / off-peak spread−15 %+15 %Solar yield−15 %+10 %NMD reduction225 kVA585 kVAPlant availability95 %99 %BASE NPV R19 m

Even the worst single case leaves an NPV of R16 m.

Fig 13-3 · Usable energyMeasured curve · kWh
05001 0001 5002 000kWh400 kWh held for the cold store1 450 kWh in year 15Y0Y2Y4Y6Y8Y10Y12Y14Usable energy, A2000Cold-store reserve

On the cell maker’s measured curve at 1.02 cycles a day. The peak-shifting saving is cut in step with it; solar loses 0.5 % a year.

Indicative ownership termsFinal terms in the site proposal
StructureTurnkey supply, install and commissioning
OwnershipThe grower, from commissioning
O&M15-year service agreement, AMPROTEQ
Availability≥ 97 %, measured monthly
CapacityTested yearly against the measured curve
AugmentationNone needed in the term
MonitoringSolaris, 24 / 7, alarms to the farm office
AlternativeService agreement: fixed monthly fee
14 · Resilience & delivery

When the feeder trips,
the cold store holds.

PULSE opens in half a cycle and the A2000 takes the cold-store bus. HELIOS keeps charging from the array; the genset starts only if the battery runs low.

Illustrative case · composite site · not a client project

Fig 14-1 · Thursday 16 July: a veld fire takes the feeder from 13:00 to 16:00Modelled · kW
PEAKPEAK04008001 2001 600kWFEEDER DOWN13:00–16:00CEILING1 150 kWSOC100 %0 %+1 MW0−1 MW00:0003:0006:0009:0012:0015:0018:0021:0024:00Load before the plantGrid draw with itBatteryHELIOS solarCharging from the gridState of charge

The packing lines stop and the roof inverters trip. The cold rooms, pre-cooling and degreening run on as an island, on stored energy and the sun with no genset; inside the window the dashed line is that board alone. The cost: most of that evening’s peak shift.

26Feeder trips a year, modelled
64 → 14hGenset hours a year
4.7k litresDiesel avoided a year
26 → 0Compressor trips a year
Fig 14-2 · From load study to commercial operationIndicative, weeks
W0W2W4W6W8W10W12W14W16W18W20W22W24W26Load study and proposalAgreement, land screenEskom application, protectionSupply and delivery to siteSlab, array frames, trenchInstall, connect, commissionCommercial operationWeek 26AMPROTEQThe grower, with our supportGate
Risks we carry, and how
Array approvalLodged at order; no export, to NRS 097-2-1
Tariff changesSolaris re-optimises to the new clock
Cell ageingMeasured curve; both peaks still covered in year 15
FireClean-agent suppression; firebreak at the array

Illustrative case on a composite site; not a client project and not an offer. Modelled with Eskom’s Schedule of Standard Prices 2026/27 (Ruraflex, ≥ 500 V and ≤ 22 kV, zone 1), PVGIS (SARAH3) yield for Tzaneen and APEX A2000, HELIOS H500 and PULSE P1000 ratings. The outage pattern, escalation beyond 2027/28, the installed cost and all site data are assumptions.

15 · Questions

Asked by agriculture
buyers.

Does storage pay on a rural tariff?
Not always on tariff savings alone: outside the high season the gap between peak and off-peak prices is small. Paired with solar and a diesel bill it often does. The load study tells you which side of the line your farm is on.
Should the irrigation pumps run on the battery?
Pumps that can be moved off-peak usually should be, on a timer; the battery carries the loads that cannot move. The load study shows which is which.
Can it run with our generator?
Yes. Solaris dispatches the generator as one resource among several and runs it only when the battery reserve calls for it.
The agriculture pack.

Two documents,
one decision.

The brief is the four-page case for storage and solar on a farm’s own board. The case study runs the numbers on a modelled citrus pack-house and cold store on a 22 kV rural line, half-hour by half-hour, on Eskom’s 2026/27 Ruraflex tariff.

Cover of the AMPROTEQ agriculture sector brief: an APEX battery container and transformer skid beside a farm shed, with vineyards and mountains behind at dusk, and the headline Agriculture on stored sun
Sector briefAMP-SB-AGR · Rev 1.0

Battery storage for agriculture

4 pages · PDF · 1.9 MB

<5yrsSimple payback
75%Less energy bought in peak
53%Of the energy saving from sun
Inside
  1. 01Where the money is, and who it is for
  2. 02The system: APEX A2000, HELIOS H500, PULSE P1000 and the measured ageing curve
  3. 03Feeder down: the farm as its own island
  4. 04The return
Download the sector brief
Cover of the AMPROTEQ agriculture case study: an APEX battery container beside a pack-house loading dock, with orchards and mountains behind, and the headline Taking a citrus pack-house out of the peak
Case studyAMP-CS-AGR · Rev 1.0

Taking a citrus pack-house out of the peak

8 pages · PDF · 2.0 MB

Illustrative case · composite site · not a client project

R3.5mOff the bill in year one
30%Project IRR over 15 years
64 → 14hGenset hours a year
Inside
  1. 01The site
  2. 02The load
  3. 03The plant
  4. 04How it runs
  5. 05The bill
  6. 06Fifteen years
  7. 07Resilience & delivery
Download the case study

Figures in both documents are modelled on Eskom’s 2026/27 Ruraflex tariff, PVGIS solar yield and indicative costs. A site proposal replaces every one with numbers from your own data.