How we deliver

From meter data to a commissioned plant.

Five stages, one accountable director. Nothing arrives on your slab as a kit of parts.

01 · The stages

What happens,
and what you get.

StageWhat happensWhat you receive
01 · AssessTwelve months of interval data, the tariff schedule and NMD, modelled as the site actually behavesSizing, indicative capex and PPA rate in five working days
02 · DesignPV, storage, conversion and the medium-voltage interface sized together, modelled over 25 years of escalationSingle-line diagram, layout, bill of quantities, proposal
03 · IntegrateRacks, PCS, transformer, switchgear, liquid cooling and fire systems assembled, cabled and burned in before shippingFactory acceptance test, witnessed if you wish
04 · CommissionPlinth, trenches and earthing; set-down, terminations, protection settings and grid-code tests on siteCommissioning record and grid-compliance sign-off
05 · OperateSolaris dispatches against the tariff calendar and demand limit; we maintain and monitor cell-level healthMonthly tariff reconciliation, asset-health and availability reports
02 · What we need

Ten minutes
of your time.

  1. 01
    Interval dataTwelve months at 30-minute resolution if you have it (CSV or XLS from your meter or Eskom portal).
  2. 02
    Tariff scheduleWhich Eskom or municipal tariff the site is on.
  3. 03
    Notified maximum demandCurrent NMD and connection capacity.
  4. 04
    Site constraintsAvailable land, existing generation, process criticality, and a single-line diagram if you have one.
03 · Site scope

What happens
on your site.

  1. 01
    Civil worksA plinth per block, cable trenches and earthing.
  2. 02
    Separation and accessClearances follow the installation manual and NFPA 855 guidance; blocks sit at least 3 m apart.
  3. 03
    ConnectionLV at 400 V for the A100, or MV at 11, 22 or 33 kV through a factory-tested skid.
  4. 04
    CommissioningProtection settings proven against the utility's requirements before the plant dispatches.
04 · Operation

Reported against
what was promised.

Live

Dispatch view

Real-time flows across solar, storage, grid and generator, on web and mobile.

Monthly

Tariff reconciliation

Modelled against actual cost per rate period, reconciled to your utility bill.

Contractual

Availability and health

State of health, cycle count, temperature spread and performance against the guarantee.

Next step

Start with your meter data.

Twelve months of interval data, your tariff schedule and your notified maximum demand are enough for a first sizing, an indicative capex and a PPA rate, within five working days, at no cost.